Advanced Distribution Management Systems (ADSM) for more efficient and flexible distribution grids
Ente erogante: Commissione Europea - Horizon Europe
Scadenza
1 dicembre 2027
593 giorni rimanenti
Forma
Fondo perduto
Budget totale
Non specificato
Contributo max
Non specificato
Descrizione del bando
Expected Outcome:Project results are expected to contribute to all the following expected outcomes:Enhanced reliability, resilience, controllability and efficiency of electricity distribution grids. Congestion in distribution grids is managed effectively;Distribution system operators (DSO) leverage modern digital solutions and employ improved systems to effectively manage their grids and improve interoperability with TSOs and other DSOs;Vendor-agnostic reference architectures, solutions and tools are developed to help advancing the ADSM design and operation and effectively manage a broad range of grid services. Scope:Projects are expected to address all the following items:Design and test innovative solutions, architectures, technologies and processes for advancing the way the ADSM are designed and operated;Provide ADSM software platforms that improve grid performance, controllability, and help integrating distributed energy resources (DERs) in an efficient way, while reducing congestion and improving grid flexibility;Advance forecasting solutions for energy supply, demand, and flexibility made available to the system operator; provide advanced analytics and visualisations;Advance interoperability, both with TSOs and other DSOs, as well as with the DERs at the edge of the grid;Leverage modern solutions, notably digital twins and artificial intelligence. Use security-by-design and advanced protection mechanisms against cyber threats. Use and/or develop, to the greatest extent possible, open-source software solutions and or software modules;Develop a manual and propose best practices on this matter to be used by other DSOs (including instructions to operate the system). Identify remaining gaps and further needs for research and development. The demonstration, test and validation of the activities should be carried out in at least two pilots in different EU Member States or Associated Countries.Projects are expected to include at least three Distribution System Opera
Non capisci questo bando?
L'AI di Bandiora te lo spiega in modo semplice: requisiti, importi, scadenze e a chi è rivolto, tutto chiaro.
Registrati e fatti spiegare il bando dall'AIArea geografica
Tematiche
Requisiti dettagliati
Questo bando è rivolto a 3 tipologie di impresa in 8 settori ATECO nell'area eu.
Scopri con l'AI se questo bando è adatto alla tua azienda
Analisi automatica di compatibilità, requisiti e matching in tempo reale
Prova gratis 7 giorniQuesto bando fa per la tua azienda?
L'AI di Bandiora analizza la compatibilità con la tua azienda in tempo reale e ti assiste nella compilazione della candidatura, passo dopo passo.
Altri bandi che potrebbero interessarti
Support to test EIC innovations for public and private procurers
Commissione Europea
Scadenza: 17 aprile 2026
Technical Assistance for Disaster Risk Management (Track 1)
Commissione Europea - UCPM
Scadenza: 21 aprile 2026
Improving availability of secondary raw materials through recycling (IA)
Commissione Europea - Horizon Europe
Scadenza: 21 aprile 2026
Cooperation on innovative advanced materials with Japan (CSA)
Commissione Europea - Horizon Europe
Scadenza: 21 aprile 2026